Home
PricingBlogAboutinfo@indogateway.idGet an Entry Plan

PT PMA Minimum Capital Requirements in Indonesia: 2026 Guide

Understand Indonesia's 2026 PT PMA capital rules, the IDR 2.5 billion paid-up capital floor, the separate investment threshold and funding planning.

Get a Project ReviewCheck Requirements
PT PMA Minimum Capital Requirements in Indonesia: 2026 Guide

For most foreign investors establishing an Indonesian limited liability company, the central 2026 capital rule is at least IDR 2.5 billion in placed and paid-up capital per PT PMA, unless another law or sector rule requires a different amount. That figure should not be confused with the company’s total investment plan. The general foreign-investment threshold remains a total investment value of more than IDR 10 billion under the applicable calculation basis, commonly per five-digit KBLI per project location and excluding land and buildings.

This distinction changed the practical setup conversation after Minister of Investment and Downstream Industry/BKPM Regulation No. 5 of 2025 reduced the general placed and paid-up capital minimum from the previous IDR 10 billion rule. It did not reduce the standard total investment commitment to IDR 2.5 billion. Founders still need a realistic project budget, correct KBLI mapping and enough funding for the company’s actual launch.

Key Takeaways

  • The general 2026 minimum placed and paid-up capital for a PT PMA is IDR 2.5 billion per company, unless another applicable rule provides otherwise.
  • The general minimum total investment value is more than IDR 10 billion under the applicable KBLI and project-location calculation method.
  • Paid-up capital is equity actually contributed to the company; investment value is the broader project plan and can include qualifying fixed assets and working capital.
  • Sector-specific rules and special activity calculations can change the general position.
  • The regulation limits movement of the minimum paid-up capital for at least 12 months, except for purchasing assets, constructing buildings or company operations.
  • The capital written into the deed, bank funding, OSS investment plan and investment reporting should tell one consistent commercial story.

PT PMA Capital Requirements at a Glance

Concept General 2026 position Practical meaning
Authorised capital Set by the founders, subject to applicable laws and the need to support the issued capital. The maximum share capital provided for in the articles without first increasing the authorised amount.
Placed and paid-up capital At least IDR 2.5 billion per PT PMA, unless another regulation provides otherwise. Shares subscribed and fully paid by the shareholders.
Minimum investment value Generally more than IDR 10 billion under the applicable activity and location calculation, with special rules for certain sectors and projects. The overall investment plan, not the amount that must all be paid as share capital at incorporation.

The official basis is Minister of Investment and Downstream Industry/BKPM Regulation No. 5 of 2025, effective from 2 October 2025. Article 26 separates the minimum investment value from minimum capitalisation and sets the placed and paid-up capital floor at IDR 2.5 billion per limited liability company, subject to other laws.

Paid-Up Capital and Investment Value Are Not the Same

Visual comparison of authorised capital, paid-up capital and total PT PMA investment value.
Authorised capital, paid-up capital and investment value serve different purposes.

This is the most important concept in PT PMA capital planning. Paid-up capital is shareholder equity issued by the company and paid by the shareholders. It appears in the company’s constitutional and corporate records. The minimum investment value is the planned scale of the foreign-investment project recorded through the licensing and investment framework.

Under the general rule, the investment plan is more than IDR 10 billion, excluding land and buildings, per five-digit KBLI per project location. A business can therefore have IDR 2.5 billion in paid-up equity and a larger project investment plan funded over time through additional equity, retained earnings, shareholder or third-party financing, and operating cash flows, subject to corporate, tax, foreign-exchange, banking and transfer-pricing considerations.

The lower paid-up minimum is not permission to invent an unfunded investment plan. The figures should be supported by a credible budget showing premises, equipment, systems, professional costs, staffing, inventory, marketing and working capital appropriate to the activity. A capital structure that only meets the legal floor but cannot fund operations can create banking, audit, tax and going-concern problems.

How the IDR 10 Billion Investment Test Is Calculated

The default calculation in the current implementing regulation is more than IDR 10 billion, excluding land and buildings, for each five-digit KBLI business field at each project location. The regulation then provides special calculation methods for several activities:

  • Wholesale trade is calculated by the first four KBLI digits.
  • Food and beverage services are calculated by the first two KBLI digits for each location point, with the location-point rule applied per regency or city.
  • Construction services are calculated by the first four KBLI digits.
  • Industry producing multiple products within one production line applies the threshold to that production-line context.
  • Property, short- and long-term accommodation, agriculture, plantations, livestock and aquaculture include land and buildings in the investment-value criteria.
  • Property development and public electric-vehicle charging stations have their own calculation details.
  • Projects in qualifying Special Economic Zones follow the applicable Presidential Regulation on investment business fields.

These rules make KBLI selection and project architecture financially significant. Two activities in one office may not always be treated as one investment bucket. Conversely, some grouped calculations can apply. Build the investment schedule only after confirming the precise classifications and locations in the current OSS implementation.

What Changed From the Previous Rule?

Under the previous BKPM implementing framework, the general minimum placed and paid-up capital for a foreign investment company was IDR 10 billion. The 2025 regulation reduced that general minimum to IDR 2.5 billion per PT PMA. The new rule applies independently from the continued total investment-value test.

This change gives founders more flexibility in choosing how to fund the planned investment. It can reduce the amount that must be issued as equity at the outset, but it does not eliminate the need to meet sector rules, properly pay for issued shares or finance the broader project. Existing companies should not amend their capital automatically. A reduction, reclassification or other corporate action can affect creditor procedures, tax, licences, banking and shareholder rights and should be reviewed on its own facts.

The 12-Month Capital Rule

Finance professional documenting the contribution and business use of PT PMA paid-up capital.
Bank, invoice and accounting records should preserve a clear paid-up capital audit trail.

The 2025 BKPM regulation provides that the relevant minimum placed and paid-up capital cannot be moved from the company’s account for at least 12 months from contribution, except when used to purchase assets, construct buildings or fund company operations. The applicant makes a self-declaration through OSS in connection with this commitment, and non-compliance can lead to administrative sanctions.

This is better understood as a use-of-funds rule than an instruction to leave all capital idle. Payments should be genuine company expenditures, properly authorised, invoiced and recorded. Maintain the bank statement showing the contribution, shareholder resolutions where relevant, contracts, invoices, fixed-asset records and accounting entries supporting subsequent use. Personal withdrawals, circular transfers or unexplained payments can undermine the evidence that capital was validly paid and used for the business.

How Company Law Interacts With the PT PMA Rule

Indonesia’s general company-law framework distinguishes authorised, placed and paid-up capital. Government Regulation No. 8 of 2021 provides that founders determine the authorised capital of a company and that at least 25% of authorised capital must be placed and fully paid, supported by valid evidence. A company carrying on a particular regulated activity must also follow any capital minimum in the applicable legislation.

For a PT PMA, the articles and share structure must therefore satisfy both the general corporate mechanics and the specific foreign-investment capital floor. In practice, the authorised capital should be set high enough to accommodate at least IDR 2.5 billion in placed and paid-up capital without breaching the 25% relationship. The structure should also leave sensible headroom for future equity, avoiding an unnecessary amendment each time funding is added.

A Practical Capital Planning Process

Team developing a phased investment and funding plan for an Indonesian PT PMA.
A credible investment plan connects the regulatory thresholds with a realistic operating budget.
  1. Confirm foreign ownership eligibility. Screen every intended activity under the current investment list and sector rules.
  2. Validate the KBLI scope. Use the current classification and confirm how each activity appears in OSS.
  3. Map investment buckets. Apply the correct calculation basis for every KBLI and project location, including special activity rules.
  4. Build the operating budget. Forecast pre-launch expenditure, fixed assets, inventory, staffing and working capital by phase.
  5. Design the equity structure. Set authorised and issued capital, share values and shareholder percentages consistently with company law and the PT PMA minimum.
  6. Plan additional funding. Decide whether later needs will be met through equity, shareholder loans, third-party debt or operating cash, after tax and legal review.
  7. Document the contribution. Preserve valid payment evidence and ensure the company’s books and bank records reflect the contribution.
  8. Use funds transparently. Support asset purchases, construction and operating payments with normal corporate records.
  9. Reconcile reporting. Keep the deed, OSS profile, accounts and investment activity reports consistent as the project develops.

IndoGateway’s PT PMA company registration service can coordinate the corporate and OSS setup, while its accounting and bookkeeping support helps maintain the evidence behind capital and investment reporting.

Common Capital Planning Mistakes

Calling IDR 2.5 Billion the Total Investment Requirement

The amount is the general minimum placed and paid-up capital per PT PMA. The investment plan is a separate and usually larger requirement.

Multiplying or Grouping Activities Incorrectly

The calculation basis varies for wholesale, food and beverage services, construction, industry and specified land-intensive activities. Apply the current rules to the actual KBLI and location map.

Setting Authorised Capital Too Low

The articles must accommodate the placed capital while satisfying the general 25% rule. The share values and ownership percentages should also divide cleanly and reflect the intended economics.

Using Capital Without an Audit Trail

Ordinary business spending is contemplated by the rule, but unsupported transfers are risky. Use the company bank account and retain approvals, contracts, invoices and accounting records.

Ignoring Sector-Specific Capital

Banking, insurance, financial technology, construction, transport and other regulated activities may have different capital or net-worth requirements. The general PT PMA floor does not override a more specific rule.

Frequently Asked Questions

1. What is the minimum paid-up capital for a PT PMA in 2026?

The general minimum placed and paid-up capital is IDR 2.5 billion per PT PMA under Article 26(10) of Minister of Investment and Downstream Industry/BKPM Regulation No. 5 of 2025. The rule includes an important qualification: another applicable law or regulation can require a different amount. Investors should therefore check the exact business sector as well as the general rule. The IDR 2.5 billion figure is not the total investment threshold and should not be described as the complete cost of establishing or operating the company.

2. Is the PT PMA investment requirement still more than IDR 10 billion?

Yes. The current general rule requires a total investment value of more than IDR 10 billion under the applicable calculation basis, while setting the separate paid-up capital minimum at IDR 2.5 billion. For many activities, the investment threshold applies per five-digit KBLI per project location and excludes land and buildings. Special calculation rules apply to certain sectors and projects. The investment amount is a planned project value, not necessarily cash that must all be deposited at incorporation, but it should be supported by a credible and reportable business budget.

3. What is the difference between authorised and paid-up capital?

Authorised capital is the capital ceiling stated in the company’s articles, divided into shares that the company may issue. Placed capital is the portion subscribed by shareholders, and paid-up capital is the placed capital that has been fully contributed. Indonesian company rules generally require at least 25% of authorised capital to be placed and fully paid. For a PT PMA, the placed and paid amount must also meet the applicable foreign-investment minimum. Founders should choose share values and an authorised ceiling that support the initial ownership percentages and foreseeable future funding.

4. Must the IDR 2.5 billion remain untouched in a bank account for 12 months?

Not necessarily. The regulation restricts movement of the minimum placed and paid-up capital for at least 12 months but expressly allows its use to purchase assets, construct buildings or fund company operations. The practical priority is traceability and genuine business use. The company should keep evidence of the shareholder contribution and every subsequent payment, including bank statements, contracts, invoices, approvals and accounting records. Transfers back to shareholders, circular funding or personal spending can create compliance and evidentiary problems and should not be treated as acceptable use.

5. Can a shareholder contribute equipment instead of cash?

Indonesian company law can permit share contributions in forms other than cash, subject to valuation, disclosure and corporate requirements, but a PT PMA should not assume that equipment automatically satisfies every investment, OSS, banking or sector expectation. The asset must be lawfully owned, properly valued, transferred to the company and recorded. Import duties, taxes, customs status and product or machinery approvals may also arise. Before relying on an in-kind contribution, obtain Indonesian legal, tax and accounting advice and confirm how the contribution will be evidenced in the deed and company records.

6. Does every KBLI require a separate IDR 2.5 billion paid-up capital amount?

The general IDR 2.5 billion minimum is stated per limited liability company, not per KBLI. By contrast, the investment-value requirement is calculated according to the applicable activity and location rules and may create multiple investment buckets. A PT PMA with several activities does not automatically multiply its paid-up capital floor by the number of codes, but it still needs sufficient real funding for its operations and must meet any sector-specific capital requirement. The investment plan for each activity should be mapped carefully before the founders finalise the share structure and budget.

7. Do existing PT PMA companies need to reduce their capital to IDR 2.5 billion?

No. The regulatory reduction in the general minimum does not require an existing PT PMA to reduce capital already issued and paid. Capital reduction is a separate corporate action that may involve shareholder approval, creditor procedures, a notarial deed, Ministry of Law processing, tax analysis, licensing updates and sector consent. It can also weaken the company’s balance sheet or financing position. Existing businesses should retain their present structure unless a properly reviewed commercial reason supports a change; the new minimum is a floor, not a recommended target for every company.

8. How should capital be reported after incorporation?

The company should keep its corporate documents, bank evidence, general ledger, OSS investment data and investment activity reports consistent. Contributions should be recorded as the correct form of equity, and later shareholder funding should not be casually mixed between equity and debt. Project expenditure and realised investment should be supported by invoices, asset records and payment evidence. Reporting obligations and frequency depend on the company’s classification and current rules. Assign responsibility to a finance or compliance owner and reconcile the reporting figures before each submission rather than reconstructing them after a regulator asks questions.

Conclusion

The 2026 PT PMA capital framework is more flexible than the previous regime, but it still expects substantive investment. Treat IDR 2.5 billion as the general minimum equity floor, not as the full project commitment. Build the ownership structure, authorised capital, paid-up contribution, total investment plan and funding schedule from the same operational assumptions. When those figures align with the exact KBLI scope, location and licensing route, the company is better prepared for incorporation, OSS licensing, banking and ongoing reporting.

Build a Defensible PT PMA Capital Plan

IndoGateway can help align your share structure, investment budget, KBLI scope and OSS licensing route before incorporation. Contact IndoGateway to discuss a practical PT PMA setup plan for your Indonesia operations.

Keep reading

Related articles

View all articles
Planning to enter or expand in Indonesia?